Niagara Falls, Ontario
Counterpart Brewery, competed in 2019, consisted of an interior renovation of a pre-existing unoccupied commercial/industrial suite within the Stanley Park building. The design included a mezzanine overlooking the bar and entire restaurant, creating a unique experience while also allowing for private dining events. The mezzanine level built functionality to the floor area that was otherwise taken up by refrigeration equipment, utilizing the space available above as a result of the high ceilings. The project was completed with an aggressive schedule and other business/occupants within the building were not disrupted during construction.